BSEIF’s Digital Infrastructure division has published What BlackRock’s Consortium Paid for in Aligned Data Centers: Is It Really Worth the Full $40bn?, the tenth piece of official divisional research released by the association and the division’s first full paper after its Initial Statement. It was written by Tanmay Gambhir, Nicholas, Matjaž, Luna, Edvard, Samir and Giulio, reviewed by Lorenzo Barbagelata and Tanmay Gambhir, and approved by Lorenzo Barbagelata, Head of Digital Infrastructure. The paper examines the purchase of Aligned Data Centers from funds managed by Macquarie by AIP, MGX and BlackRock’s Global Infrastructure Partners, completed on 21 July 2026 at an enterprise value of about $40bn.
Its starting point is a misleading headline figure. Spread across Aligned’s more than 6.4 GW of operating and planned capacity, the price works out to about $6.25m per MW, well below the roughly $14m per MW it now costs to build new capacity. However, most of the 6.4 GW does not yet exist. Using a third-party estimate of about 750 MW in operation, the paper values the operating business at $11.2bn and the identified construction at $2.6bn, which leaves a $26.2bn residual, 66% of the price, for capacity that is only planned. That residual is an allocation, not a market appraisal of undeveloped capacity.
Whether the pipeline is worth that amount depends above all on rent. Aligned’s only public rent, about $87/kW/month from its 2021 securitisation pool, is far below what new space costs today, and at that level the planned capacity fails the model. With 60% of the pipeline delivered, new leases need about $172/kW/month, inside CBRE’s $160–$185 asking range for large Northern Virginia requirements. Four scenarios move the break-even rent from $141 to $304, and a 24-month grid delay alone raises it to about $191.
The paper then models the financing and compares the price with precedents. A 15% gross equity return needs $181.72 on new leases once failed-project costs are included, or about $187 with an illustrative 20% haircut to completed but unleased capacity, above the top of CBRE’s range. Aligned costs $53.3m per estimated operating MW and 59.8 times modelled earnings, against 25.9 to 34.9 times for CyrusOne, QTS and Switch, although the denominators differ. Applied to Ardian’s Verne, the same method shows how delivery risk was priced in Europe: up to $135m of the price depended on EBITDA growth, and the earn-out was settled for £10m after power constraints at Keflavík.
The conclusion is conditional. Signed rents, remaining construction costs, lease-up and acquisition financing are not public, so neither threshold verifies the buyers’ actual returns. Every figure carries a source, the capacity split and debt terms are labelled as assumptions, and the paper uses public information only. It is a research exercise by Bocconi students and is not investment advice.
The full paper is available under Insights, in the Digital Infrastructure section. It can be read on the website, opened separately or downloaded as a PDF.